A homeowner who insulates their attic without addressing solar shading discovers, as soon as the first summer arrives, that their house traps heat like a greenhouse. This scenario is repeated on most renovation projects, where winter is taken care of without planning for summer. In 2026, renovation work can no longer focus solely on reducing heating bills: summer comfort, ventilation and preserving older buildings carry just as much weight.
Summer overheating and renovation: the trap of insulation without solar shading
Renovations are often planned with the colder months in mind. Insulating walls and roofs reduces heat loss in winter, but it also traps solar heat in summer if nothing is done to limit it beforehand.
In practical terms, an older house with solid wooden shutters and thick stone walls naturally regulated heat. Replacing those shutters with windows that have no external shading, or adding internal wall insulation without suitable ventilation, disrupts that balance. Solar shading, night-time ventilation and the risk of overheating must be assessed before insulating, not afterwards.
To follow Renov Motiv news on these kinds of practical issues, it’s a good idea to check in before starting a project.
The right solutions depend on the building. For a stone house, external insulation is often preferred (as it preserves the walls’ thermal mass), combined with hinged shutters or projection awnings. In a 1970s bungalow, night-time cross-ventilation remains the most effective and least expensive option.
Ventilation in older buildings: practical challenges
Installing a heat-recovery ventilation system in a half-timbered or ashlar stone house raises issues around drilling through the structure and managing moisture. A poorly sized ventilation system in an older building causes condensation, not comfort.
A practical alternative is positive input ventilation, which is less invasive, combined with humidity-sensitive vents on existing windows. This preserves the building’s character, avoids thermal bridges caused by drilling and maintains adequate air exchange.

Energy performance certificates and renovation grants: check before signing a quote
An energy performance certificate (EPC) remains the starting point for any renovation project, but its rating can change even when no work has been done. For some homes heated by electricity, an updated EPC can change the rating without any alterations to the building. Before commissioning work based solely on an old assessment, having the EPC recalculated helps avoid planning a project around outdated data.
Grant eligibility rules can also change while a project is being prepared. A funding package approved at the start of the year may no longer be valid six months later. Best practice is to check eligibility for available schemes (MaPrimeRénov’ and regional grants) again just before signing the contractor’s quote, rather than when the idea first comes up.
Rental properties and energy-inefficient homes: distinguish current rules from proposed reforms
The debate over banning rentals of energy-inefficient homes is still evolving. Bills may ease or tighten requirements depending on parliamentary votes. For landlords, the only reliable approach is to check the legislation actually enacted before planning to rent out a property.
Preparing for an obligation that does not yet exist can lead to unnecessary work. Waiting to act on a ban that is already in force can result in a fine. To establish where things stand, check the current legislation rather than press articles discussing proposed changes.
Reusing materials on a renovation project: practical considerations
The reuse of construction materials is gaining ground, but it depends on logistical constraints that are rarely mentioned. A documented case study in Le Mans describes the recirculation of downgraded timber, surplus materials from construction sites and materials salvaged from demolition, at prices below those of new products.
For material reuse to work on a project, three conditions must be met:
- Availability at the right time: a batch of reclaimed beams cannot be stored indefinitely, so the project schedule must adapt to supply, not the other way around
- The materials’ actual condition: reclaimed timber must be inspected for wood-boring insects, residual moisture and structural strength before it is used
- Traceability for insurance: some insurers require a technical data sheet or quality inspection, even for reused materials, making it harder to use products with no original documentation
When renovating an older house, reuse has an added benefit: period materials (terracotta tiles, ashlar stone, woodwork) fit in better with the existing building than standardised new products.

Planning renovation work: balancing insulation, windows and heating
The order in which work is carried out affects the final result. Replacing a boiler before insulating can lead to oversized equipment, since heating needs will fall once insulation is installed. Conversely, insulating without first addressing air leaks around windows wastes some of the potential energy savings.
The sequence that delivers the best results for most detached houses is:
- Windows and doors first, to eliminate unwanted draughts and install ventilation components
- Ventilation next, sized according to the home’s actual volume and humidity levels
- Wall and roof insulation third, to enclose a building that is already airtight
- Heating last, sized to meet the home’s actual needs once it has been insulated
Signing a quote before an energy audit can lock in technical choices that are not always suitable. Having the audit carried out by an independent RGE-certified professional, rather than the company doing the work, ensures unbiased advice.
In humid climates or coastal areas, this sequence matters even more. Insulation installed on poorly ventilated walls traps moisture and can damage the building within a few years. Adapting the order of work to the local climate helps avoid costly remedial work. Plan the renovation budget item by item, based on the assessment—not on a standard package applied to every home.